Team Sport appointed Hann Tucker Associates in 2017 to undertake an operational noise breakout assessment of a proposed 500m long, multiple level indoor karting track in Coventry to support the planning application and to provide general advice relating to acoustic issues. The proposal was to occupy an existing building that had been used as a distribution warehouse. The warehouse has lightweight external cladding and plastic rooflights. The close proximity of neighbouring residencies attracted a heightened level of local interest. The assessment required the measurement of indoor karting noise at an existing indoor karting track and the calculation of the karting noise breaking out though the extrenal building fabirc of the warehouse using state of the art sound insulation calculation software. The planning application was successful and Team Sport opened their 26th UK indoor karting track in Coventry in August 2018!